Skip to content
worldfires
MZ · Mozambique · →

Gorongosa fire, 1 September 2023 Gorongosa

Out · last detection 12 Sept 2023, 11:37 UTC

The fire started on 1 September 2023 in Gorongosa, Mozambique, and satellites saw it burning for 12 days. Copernicus’s global GWIS system rebuilt a burnt perimeter of 13,157 hectares from heat detections, spread across a single municipality.

It is the 17th largest in Sofala since 2016 (of 214 with a page). Number 11 in Mozambique in 2023, of 128.

Compare with…
Burnt area
13,157ha
GWIS perimeter (Copernicus)
Duration
12days
1 Sept 2023 – 12 Sept 2023
Municipalities hit
1
districts
Started on
1 Sept
2023
Heat detections
657
in a single hotspot: 109 MW
Danger at start
9
Low · FWI index
Average daily power
576MW
detected power per day, on average

Where it burned

HOTSPOTS BY DAY 1 Sept12 Sept
12 Sept 2023

How it evolved, day by day

1 Sept 2023 · 90 MW · 12 2 Sept 2023 · 9 MW · 2 3 Sept 2023 · 196 MW · 10 4 Sept 2023 · 283 MW · 30 5 Sept 2023 · 1,018 MW · 67 6 Sept 2023 · 534 MW · 42 7 Sept 2023 · 102 MW · 13 8 Sept 2023 · 434 MW · 41 9 Sept 2023 · 522 MW · 21 10 Sept 2023 · 744 MW · 63 11 Sept 2023 · 2,554 MW · 220 12 Sept 2023 · 427 MW · 40
1 Sept 3 Sept 5 Sept 7 Sept 9 Sept 11 Sept

Fire radiative power detected each day, in megawatts, and number of hotspots. The magenta bar marks the peak day.

The weather it burned in

35°high
56km/h · peak gust
27%lowest humidity

It had gone one day without rain (1 mm or more) when it started.

This area had burned before

98% of the perimeter overlaps earlier fires recorded since 2016: 4,633 ha in 2016, 4,706 ha in 2017, 4,505 ha in 2018, 7,835 ha in 2019, 3,832 ha in 2020, 10,460 ha in 2021, 10,119 ha in 2022. Part of it burned more than once, so the yearly figures add up to more than the 12,869 ha that had burned before.

How big is it?

10 km
It burned the equivalent of 8.3% of the area of London (132 km² against 1,583 km²).

London boundary: geoBoundaries · Office for National Statistics (Open Government Licence v3.0).

This compares size, not location: both shapes are at the same scale, north up, centred on each other.

What happened to each town

  1. Gorongosa where it started
    13,235 ha reached on 1 Sept
    1.9 %

Burnt area inside each municipality, from crossing the GWIS perimeter with administrative boundaries. The distance runs from the point marking the centre of each area to the nearest fire: staying a kilometre away does not mean it reached the houses.

People and buildings inside the perimeter

GHSL 2025
Built-up area4.8 ha
Residents≈ 1,300

Inside the perimeter there were about 4.8 hectares of built-up land and about 1,300 residents (GHSL 2025, satellite-based estimate).

This is an estimate on 100 m cells, made from satellite imagery and census data: it does not mean that homes burned or that anyone was harmed. The perimeter also contains land that never burned. The GHSL 2025 epoch is a projection made from 2020 and earlier data.

Source: Global Human Settlement Layer (GHS-BUILT-S and GHS-POP R2023A), European Commission Joint Research Centre (JRC), © European Union, CC BY 4.0. Sum inside the perimeter computed by WorldFires. human-settlement.emergency.copernicus.eu

The weather day by day

ECMWF ERA5 reanalysis at the fire location, the standard reference for past weather, and the Canadian Fire Weather Index (the same system Copernicus uses), computed by WorldFires from that data. Days after the fire run until the first rain.

Open-Meteo.com (CC BY 4.0) · Copernicus Climate Change Service (ERA5)

Day High Min. humidity Peak gust Rain Danger (FWI)
1 Sept 30.4 °C 35 % 22 km/h 0.0 mm Low 9
2 Sept 29.6 °C 40 % 24 km/h 0.0 mm Low 11
3 Sept 28.5 °C 49 % 26 km/h 0.0 mm Moderate 12
4 Sept 29.0 °C 46 % 26 km/h 0.0 mm Moderate 12
5 Sept 29.6 °C 37 % 23 km/h 0.0 mm Moderate 13
6 Sept 30.2 °C 36 % 27 km/h 0.0 mm Moderate 15
7 Sept 27.1 °C 47 % 27 km/h 0.4 mm Moderate 14
8 Sept 27.7 °C 47 % 28 km/h 0.0 mm Moderate 14
9 Sept 28.1 °C 44 % 26 km/h 0.0 mm Moderate 15
10 Sept 31.2 °C 38 % 26 km/h 0.0 mm Moderate 15
11 Sept 34.6 °C 27 % 32 km/h 0.0 mm High 23
12 Sept 29.1 °C 47 % 56 km/h 12.4 mm Very low 5
13 Sept after 18.5 °C 93 % 37 km/h 22.6 mm Very low 0
14 Sept after 23.9 °C 62 % 26 km/h 2.8 mm Very low 0
15 Sept after 29.9 °C 44 % 25 km/h 0.0 mm Very low 1
16 Sept after 34.9 °C 29 % 27 km/h 0.0 mm Low 10
17 Sept after 34.8 °C 31 % 31 km/h 0.0 mm Moderate 15
18 Sept after 28.1 °C 56 % 31 km/h 2.9 mm Very low 2
19 Sept after 28.9 °C 47 % 23 km/h 0.4 mm Low 5
20 Sept after 30.4 °C 44 % 24 km/h 0.0 mm Low 9
21 Sept after 31.1 °C 41 % 28 km/h 0.0 mm Moderate 12
22 Sept after 31.1 °C 33 % 27 km/h 0.0 mm Moderate 14
23 Sept after 31.4 °C 38 % 32 km/h 0.0 mm Moderate 16
24 Sept after 32.3 °C 39 % 30 km/h 0.0 mm Moderate 17
25 Sept after 31.3 °C 45 % 27 km/h 0.0 mm Moderate 16
26 Sept after 33.8 °C 36 % 30 km/h 0.0 mm Moderate 18
27 Sept after 29.1 °C 50 % 32 km/h 0.0 mm Moderate 17
28 Sept after 30.2 °C 49 % 28 km/h 0.0 mm Moderate 17
29 Sept after 29.5 °C 53 % 29 km/h 0.2 mm Moderate 16

Before and after, from space

Drag the line to compare the same ground before the fire and after it.

Before · 25 Aug 2023
After · 19 Sept 2023

If the day is cloudy, change the date: each satellite passes once a day. In false colour the burnt ground looks brown or red.

The smoke

CAMS · Copernicus

On 12 September 2023 the air beside the fire reached 73 µg/m³ of PM2.5. That day averaged 38: 2.5 times the WHO daily guideline (15).

PM2.5 peak73 µg/m³
Days over the guideline13 days
PM10105 µg/m³
Optical depth1.21
3031123456789101112131415
Good Fair Moderate Poor Very poor Extremely poor

Particles from the Copernicus CAMS model at the centre of the perimeter; these are not measurements in each town. The pale bar is the worst hour, the solid one the daily average.

Open-Meteo.com (CC BY 4.0) · Copernicus Atmosphere Monitoring Service (CAMS)

Detections table · 657Every satellite heat detection, one by one, with time, satellite, power and coordinates.
⬇ Download CSV Times in UTC. Each detection is a 375 m pixel: a large fire yields hundreds per pass.
Date and timeSatelliteFRP (MW)LatLon

Other fires nearby

All fires in Mozambique ›

Frequently asked questions

How long did the Gorongosa fire last?
GWIS (Copernicus) dates it between 1 September 2023 and 12 September 2023: 12 days between the first and last heat detection of the perimeter.
How much area did it burn?
The perimeter GWIS (Copernicus) rebuilt from heat detections is 13,157 hectares (131.6 km²). It is an estimate: official national figures may differ.
Which municipalities burned?
The fire only entered Gorongosa (13,235 ha, 1.9 %).
What was the weather like?
During the fire the temperature reached 34.9 °C, humidity dropped to 27 % and gusts hit 56 km/h. The fire danger index (FWI) reached 23, class High.
Where does this data come from?
From the GWIS (Copernicus) burnt perimeter, NASA FIRMS VIIRS hotspots and the administrative boundaries of Mozambique (geoBoundaries). It is not an official report.

Where to verify it

A satellite detection is not an official report. Final figures and the fire’s status are published by each country’s emergency service.

Satellite cross-check

History of this page Changes in area, dates, name, official record or merged pages, compared every night since 24 October 2026.

No changes since 24 October 2026.

RSS Changes to this page

Does something look wrong on this page?

This page is built from satellite data and official records, and it sometimes gets things wrong: the wrong dates, the wrong town, two fires merged into one, or something that was not a wildfire at all. If you know this fire first-hand (you live nearby, saw it, fought it or reported on it), tell us what really happened and we will check it.

Report an error
What do you think is wrong?

We will only use your email to reply about this report. Privacy.

How we know this
  • Perimeter: GWIS (Copernicus), rebuilt from heat detections rather than mapped on imagery; 3 polygons grouped in this page.
  • Dates from the perimeter: the VIIRS detections inside it did not change them. 657 Suomi-NPP VIIRS detections on those dates.
  • We have not matched this page with any official record.
  • Weather: Copernicus ERA5 reanalysis at the fire location, in cells of about 25 km.
  • Built-up area and population come from the JRC Global Human Settlement Layer (epoch 2025, 100 m cells), summed inside the perimeter: an estimate of what was there, not a damage count.

How we build fire pages: methodology ›

Where this data comes from

The perimeter comes from the Copernicus Global Wildfire Information System (GWIS), which rebuilds it from MODIS and VIIRS heat detections and publishes it under CC BY 4.0. It is not measured on imagery as in Europe, so it is an estimate. Heat detections come from the VIIRS sensors aboard Suomi-NPP and NOAA-20, distributed by NASA FIRMS at 375 m resolution. Municipal boundaries come from geoBoundaries ADM2 (Creative Commons Attribution 3.0 Intergovernmental Organisations (CC BY 3.0 IGO)). The area per municipality is computed by WorldFires by crossing the perimeter with those boundaries, so it may differ from each country’s official figure.