Skip to content
worldfires
MX · Mexico · →

San Dimas fire, June 2023 San Dimas, San Ignacio

Out · last detection 14 Jun 2023, 20:05 UTC

The fire started on 4 June 2023 in San Dimas, Mexico, and satellites saw it burning for 11 days. Copernicus’s global GWIS system rebuilt a burnt perimeter of 2,043 hectares from heat detections, spread across 2 municipalities.

It is the 155th largest in Durango since 2016 (of 239 with a page). Number 172 in Mexico in 2023, of 285.

The power measured by the satellite is low (26.7 MW in the strongest hotspot), more typical of grass or stubble burning, or a slow surface fire, than of a large crown fire.

Compare with…
Burnt area
2,043ha
GWIS perimeter (Copernicus)
Duration
11days
4 Jun 2023 – 14 Jun 2023
Municipalities hit
2
municipalities
Started on
4 Jun
2023
Heat detections
175
in a single hotspot: 27 MW
Danger at start
34
High · FWI index
Average daily power
113MW
detected power per day, on average

Where it burned

HOTSPOTS BY DAY 4 Jun14 Jun
14 Jun 2023

How it evolved, day by day

4 Jun 2023 · 156 MW · 18 5 Jun 2023 · 240 MW · 30 6 Jun 2023 · 129 MW · 27 7 Jun 2023 · 243 MW · 44 8 Jun 2023 · 120 MW · 22 9 Jun 2023 · 98 MW · 23 10 Jun 2023 · 21 MW · 8 11 Jun 2023 · 5 MW · 2 14 Jun 2023 · 2 MW · 1
4 Jun 6 Jun 7 Jun 8 Jun 10 Jun 14 Jun

Fire radiative power detected each day, in megawatts, and number of hotspots. The magenta bar marks the peak day.

The weather it burned in

29°high
55km/h · peak gust
19%lowest humidity

It had gone 7 days without rain (1 mm or more) when it started. Rain came after the fire: 1.4 mm on 16 Jun.

This area had burned before

39% of the perimeter overlaps earlier fires recorded since 2016: 382 ha in 2018, 273 ha in 2019, 388 ha in 2022. Part of it burned more than once, so the yearly figures add up to more than the 796 ha that had burned before.

How big is it?

10 km
It burned the equivalent of 1.3% of the area of London (20 km² against 1,583 km²).

London boundary: geoBoundaries · Office for National Statistics (Open Government Licence v3.0).

This compares size, not location: both shapes are at the same scale, north up, centred on each other.

What happened to each town

  1. San Dimas where it started
    1,663 ha reached on 4 Jun
    0.3 %
  2. 392 ha reached on 6 Jun
    0.1 %

Burnt area inside each municipality, from crossing the GWIS perimeter with administrative boundaries. The distance runs from the point marking the centre of each area to the nearest fire: staying a kilometre away does not mean it reached the houses.

People and buildings inside the perimeter

GHSL 2025
Built-up area0.28 ha
Residents≈ 20

Inside the perimeter there were about 0.28 hectares of built-up land and about 20 residents (GHSL 2025, satellite-based estimate).

This is an estimate on 100 m cells, made from satellite imagery and census data: it does not mean that homes burned or that anyone was harmed. The perimeter also contains land that never burned. The GHSL 2025 epoch is a projection made from 2020 and earlier data.

Source: Global Human Settlement Layer (GHS-BUILT-S and GHS-POP R2023A), European Commission Joint Research Centre (JRC), © European Union, CC BY 4.0. Sum inside the perimeter computed by WorldFires. human-settlement.emergency.copernicus.eu

Official record

Several official records match this area

According to CONAFOR, 2 fires started inside this perimeter on these dates, totalling 1,323 ha (the satellite measured 2,043 ha). The two figures differ a lot, so these may not be exactly the same fire: take them as nearby records.

CONAFOR records each fire that started at a different time or place separately; the satellite sees a single burned area, so this page groups them together. The numbers on the map show where each one started.

When each one burned

1 1,061 ha 2 262 ha
4 Jun13 Jun
cause unknown or not published
  1. 1 San Dimas Ejido California Y Anexos / San Ignacio 4 June 2023 1,061 ha · extinguished on 12 June 2023 · cause: unknown
  2. 2 San Ignacio California 4 June 2023 262 ha · extinguished on 14 June 2023 · cause: unknown

Total according to CONAFOR: 1,323 ha, 65 % of the 2,043 ha in the satellite perimeter.

CONAFOR (Comisión Nacional Forestal), estadística de incendios forestales en datos.gob.mx (CC BY 4.0). This is the agency’s consolidated statistic: it measures the area in its own way, which is why it can differ from the satellite.

The weather day by day

ECMWF ERA5 reanalysis at the fire location, the standard reference for past weather, and the Canadian Fire Weather Index (the same system Copernicus uses), computed by WorldFires from that data. Days after the fire run until the first rain.

Open-Meteo.com (CC BY 4.0) · Copernicus Climate Change Service (ERA5)

Day High Min. humidity Peak gust Rain Danger (FWI)
4 Jun 26.7 °C 19 % 55 km/h 0.0 mm High 34
5 Jun 26.6 °C 36 % 48 km/h 0.6 mm High 26
6 Jun 23.9 °C 39 % 46 km/h 1.3 mm Moderate 15
7 Jun 24.8 °C 34 % 52 km/h 0.0 mm High 23
8 Jun 25.5 °C 28 % 53 km/h 0.0 mm High 28
9 Jun 28.0 °C 21 % 49 km/h 0.0 mm High 33
10 Jun 27.4 °C 30 % 47 km/h 0.2 mm High 33
11 Jun 29.0 °C 27 % 49 km/h 0.1 mm High 34
12 Jun 29.2 °C 27 % 49 km/h 0.0 mm High 34
13 Jun 31.0 °C 19 % 50 km/h 0.0 mm High 37
14 Jun 29.7 °C 25 % 46 km/h 0.4 mm High 37
15 Jun after 28.9 °C 37 % 41 km/h 0.9 mm High 22
16 Jun after 28.2 °C 45 % 45 km/h 1.4 mm Moderate 14

Before and after, from space

Drag the line to compare the same ground before the fire and after it.

Before · 28 May 2023
After · 21 Jun 2023

If the day is cloudy, change the date: each satellite passes once a day. In false colour the burnt ground looks brown or red.

The smoke

CAMS · Copernicus

On 6 June 2023 the air beside the fire reached 23 µg/m³ of PM2.5. That day averaged 17: 1.1 times the WHO daily guideline (15).

PM2.5 peak23 µg/m³
Days over the guideline2 days
PM1034 µg/m³
Optical depth0.31
234567891011121314
Good Fair Moderate Poor Very poor Extremely poor

Particles from the Copernicus CAMS model at the centre of the perimeter; these are not measurements in each town. The pale bar is the worst hour, the solid one the daily average.

Open-Meteo.com (CC BY 4.0) · Copernicus Atmosphere Monitoring Service (CAMS)

Detections table · 175Every satellite heat detection, one by one, with time, satellite, power and coordinates.
⬇ Download CSV Times in UTC. Each detection is a 375 m pixel: a large fire yields hundreds per pass.
Date and timeSatelliteFRP (MW)LatLon

Other fires nearby

All fires in Mexico ›

Frequently asked questions

How long did the San Dimas fire last?
According to the heat detections seen by satellite inside the perimeter, it burned from 4 June 2023 to 14 June 2023 (11 days). The perimeter dates it from 4 June 2023 to 11 June 2023.
How much area did it burn?
The perimeter GWIS (Copernicus) rebuilt from heat detections is 2,043 hectares (20.4 km²). It is an estimate: official national figures may differ.
Which municipalities burned?
The fire entered 2 municipalities: San Dimas (1,663 ha, 0.3 %); San Ignacio (392 ha, 0.1 %).
What was the weather like?
During the fire the temperature reached 29.0 °C, humidity dropped to 19 % and gusts hit 55 km/h. The fire danger index (FWI) reached 34, class High.
Where does this data come from?
From the GWIS (Copernicus) burnt perimeter, NASA FIRMS VIIRS hotspots and the administrative boundaries of Mexico (geoBoundaries). It is not an official report.

Where to verify it

A satellite detection is not an official report. Final figures and the fire’s status are published by each country’s emergency service.

Emergency number: 911 · Emergency number and official warnings ›

Satellite cross-check

History of this page · 1 Changes in area, dates, name, official record or merged pages, compared every night since 24 October 2026.
  1. Last day with fire: 11 June 2023 → 14 June 2023.

RSS Changes to this page

Does something look wrong on this page?

This page is built from satellite data and official records, and it sometimes gets things wrong: the wrong dates, the wrong town, two fires merged into one, or something that was not a wildfire at all. If you know this fire first-hand (you live nearby, saw it, fought it or reported on it), tell us what really happened and we will check it.

Report an error
What do you think is wrong?

We will only use your email to reply about this report. Privacy. This is not an emergency service: if there is a fire now, call 911.

How we know this
  • Perimeter: GWIS (Copernicus), rebuilt from heat detections rather than mapped on imagery.
  • Dates adjusted with the VIIRS detections inside the perimeter, which said 4 June 2023 to 11 June 2023. 175 Suomi-NPP VIIRS detections on those dates.
  • Compared with CONAFOR: 1,323 official ha against 2,043 ha of perimeter; similar, but with reservations.
  • Weather: Copernicus ERA5 reanalysis at the fire location, in cells of about 25 km.
  • Built-up area and population come from the JRC Global Human Settlement Layer (epoch 2025, 100 m cells), summed inside the perimeter: an estimate of what was there, not a damage count.

How we build fire pages: methodology ›

Where this data comes from

The perimeter comes from the Copernicus Global Wildfire Information System (GWIS), which rebuilds it from MODIS and VIIRS heat detections and publishes it under CC BY 4.0. It is not measured on imagery as in Europe, so it is an estimate. Heat detections come from the VIIRS sensors aboard Suomi-NPP and NOAA-20, distributed by NASA FIRMS at 375 m resolution. Municipal boundaries come from geoBoundaries ADM2 (Creative Commons Attribution 4.0 (CC BY 4.0)). The area per municipality is computed by WorldFires by crossing the perimeter with those boundaries, so it may differ from each country’s official figure.