Cuautitlán de García Barragán fire, 9 May 2022
Cuautitlán de García Barragán
Out · last detection
The fire started on in Cuautitlán de García Barragán, Mexico, and satellites saw it burning for 19 days. Copernicus’s global GWIS system rebuilt a burnt perimeter of 1,525 hectares from heat detections, spread across a single municipality.
It is number 261 by size of the 267 fires with a page that started in Jalisco since 2016. Number 223 in Mexico in 2022, of 232.
The power measured by the satellite is low (12.6 MW in the strongest hotspot), more typical of grass or stubble burning, or a slow surface fire, than of a large crown fire.
matches the official recordwith caveatssatellite onlymodel
When copying, the sentence is
Tick the figures you want: they make up the lede and the CSV.
Burned area
with caveats
1,525ha
Perimeter published by GWIS (Copernicus).
This page1,525CONAFOR1,085
Source
GWIS (Copernicus)
Date
9 May 2022 – 27 May 2022
+− cross-check
CONAFOR: 1,085 ha (matched records: 1). Difference between the page and the official record: +40.6%. Matched on 22 November 2026. The two figures differ a lot, so these may not be exactly the same fire: take them as nearby records.
Duration by satellite
satellite only
19days
9 May 2022 to 27 May 2022: first and last day with fire on the page.
Source
GWIS (Copernicus) · NASA FIRMS · VIIRS
Date
last detection: 27 May 2022, 19:43 UTC
+− cross-check
Satellites pass a few times a day and cloud or smoke can hide the fire: a lack of detections is not an official extinction. Each country’s emergency service declares a fire contained or out.
Start
satellite only
9 May 2022
First day with fire seen by the satellites or the perimeter.
Source
GWIS (Copernicus) · NASA FIRMS · VIIRS
Date
9 May 2022
+− cross-check
The two figures differ a lot, so these may not be exactly the same fire: take them as nearby records.
Hotspots
satellite only
59
VIIRS detections at 375 m. Most intense hotspot: 13 MW.
Source
NASA FIRMS · VIIRS (Suomi NPP)
Date
9 May 2022 – 27 May 2022
+− cross-check
There is no official record to compare with. Each hotspot is a pixel detected in one satellite pass, not a separate fire.
The worst day
satellite only
44MW
Total radiative power on 15 May 2022; hotspots that day: 10.
Source
NASA FIRMS · VIIRS (FRP)
Date
15 May 2022
+− cross-check
Fire radiative power (FRP) measures the energy the fire gives off when the satellite passes. Added up by day, it compares intensity, not area.
Danger at the start
model
31.6FWI · high
Fire Weather Index (Canadian system) computed by WorldFires for the day the fire started. Consecutive days without rain before: 27.
This is an index computed from weather model data, not a measurement of the fire nor an official warning. Danger warnings are issued by each country’s authority. Emergency number and official warnings ›
Weather during the fire
model
31.8°C · 39% RH
High of 31.8 °C and minimum humidity of 39% on 12 May 2022; gusts of 44 km/h on 13 May 2022.
These are model values for a cell of about 25 km, not from a weather station: they may differ from what was measured on the ground.
ⓘThis page’s change log has been kept since 24 October 2026: every night what it publishes is compared and the difference is logged. Anything earlier is reconstructed from each source’s date and marked as reconstructed.
Show
· reconstructedofficial
Matched with the official CONAFOR record
Nearby records with very different figures: 1,085 ha (records: 1).
A version keeps the area, dates, name and official record; the area as it was logged (changes under 2% are not logged). The map, hotspots and weather always show today’s data.
Citation
A lede of about 60 words figures only, no adjectives
Fire radiative power detected each day, in megawatts, and number of hotspots. The magenta bar marks the peak day.
The weather it burned in
32°high
44km/h · peak gust
13%lowest humidity
It had gone 27 days without rain (1 mm or more) when it started.
This area had burned before
93% of the perimeter overlaps earlier fires recorded since 2016: 715 ha in 2017, 1,378 ha in 2020. Part of it burned more than once, so the yearly figures add up to more than the 1,419 ha that had burned before.
Burnt area inside each municipality, from crossing the GWIS perimeter with administrative boundaries. The distance runs from the point marking the centre of each area to the nearest fire: staying a kilometre away does not mean it reached the houses.
People and buildings inside the perimeter
GHSL 2020
Built-up area< 0.1ha
Residents< 20
Inside the perimeter there was no noticeable built-up land and almost nobody lived there (GHSL 2020, satellite-based estimate).
This is an estimate on 100 m cells, made from satellite imagery and census data: it does not mean that homes burned or that anyone was harmed. The perimeter also contains land that never burned.
According to CONAFOR, this fire started on 16 May 2022 and burned 1,085 ha (the satellite measured 1,525 ha). The two figures differ a lot, so these may not be exactly the same fire: take them as nearby records.
Cuautitlán de García BarragánLa Silla16 May 20221,085 ha· extinguished on 18 May 2022· cause: negligence
ECMWF ERA5 reanalysis at the fire location, the standard reference for past weather, and the Canadian Fire Weather Index (the same system Copernicus uses), computed by WorldFires from that data. Days after the fire run until the first rain.
Open-Meteo.com (CC BY 4.0) · Copernicus Climate Change Service (ERA5)
Day
High
Min. humidity
Peak gust
Rain
Danger (FWI)
9 May
29.9 °C
43 %
37 km/h
0.1 mm
High 32
10 May
30.5 °C
42 %
37 km/h
0.3 mm
High 31
11 May
30.0 °C
42 %
37 km/h
0.9 mm
High 32
12 May
31.8 °C
39 %
43 km/h
0.8 mm
High 29
13 May
29.6 °C
43 %
44 km/h
0.0 mm
High 26
14 May
28.6 °C
40 %
42 km/h
0.0 mm
High 32
15 May
29.9 °C
33 %
40 km/h
0.0 mm
High 32
16 May
29.7 °C
35 %
38 km/h
0.4 mm
High 33
17 May
30.2 °C
31 %
37 km/h
0.0 mm
High 36
18 May
30.3 °C
13 %
40 km/h
0.0 mm
Very high 49
19 May
29.8 °C
17 %
41 km/h
0.0 mm
Very high 49
20 May
29.0 °C
39 %
41 km/h
0.0 mm
High 38
21 May
30.2 °C
29 %
40 km/h
0.0 mm
Very high 39
22 May
30.5 °C
33 %
39 km/h
0.0 mm
Very high 38
23 May
29.4 °C
36 %
37 km/h
0.0 mm
Very high 38
24 May
29.7 °C
29 %
41 km/h
0.2 mm
Very high 39
25 May
30.9 °C
33 %
39 km/h
0.0 mm
High 37
26 May
29.7 °C
40 %
37 km/h
0.4 mm
High 34
27 May
30.2 °C
44 %
41 km/h
2.1 mm
High 34
28 May after
29.6 °C
44 %
40 km/h
0.7 mm
Moderate 15
29 May after
27.6 °C
51 %
38 km/h
0.7 mm
Moderate 19
30 May after
29.0 °C
45 %
37 km/h
0.8 mm
High 21
31 May after
28.9 °C
47 %
41 km/h
0.6 mm
Moderate 21
1 Jun after
27.7 °C
49 %
38 km/h
0.2 mm
Moderate 20
2 Jun after
27.8 °C
53 %
36 km/h
0.2 mm
Moderate 20
3 Jun after
27.2 °C
55 %
35 km/h
0.3 mm
High 22
4 Jun after
28.0 °C
52 %
37 km/h
0.5 mm
High 23
5 Jun after
28.4 °C
50 %
40 km/h
0.1 mm
High 23
6 Jun after
29.2 °C
48 %
39 km/h
0.2 mm
High 23
Its twins: fires that started in the same weather
It started with an FWI of 31.6, a minimum humidity of 43% and 27 days without rain. Fires in the area that started in weather like this since 2016: 23.
FWI at the start31.6
Minimum humidity43 %
Days without rain27
this firechosen twinsrest of the area
Almost identicalSimilar
Outlines of the closest twins
This fire · Cuautitlán de García Barragán fire, 9 May 2022
1,525 ha19 daysFWI 31.6Min. humidity 43 %
Cuautitlán de García Barragán fire, April 2016
2,161 ha16 daysFWI 27.7Min. humidity 44 %30 km away, in 2016
First rain (1 mm or more) after it ended: none in the following ten days.
It stayed below its twins: 1,525 ha against a median of 2,321 ha. It lasted 19 days, against 16 days.
In 12 of 23, not even 1 mm fell in the ten days after the end: they went out without rain. In the rest, the first rainy day brought a median of 5.9 mm.
This is a bank of analogues: it shows what usually happens, not what will happen. With fewer than 15 twins we give no figures. How we calculate it
How it ended
—first rain
—no rain in ten days
44km/h · max. gust
It was considered over on 27 May, and not even 1 mm fell in the following ten days: it went out without rain. Twins with rain when they ended: 11 of 23, with a median of 5.9 mm.
Weather on this page: Open-Meteo.com (CC BY 4.0) · Copernicus Climate Change Service (ERA5)
How a twin is chosen
Same area: fires that have already ended, less than 250 km from this one, since 2016.
Same start: we compare the FWI on the first day, the minimum humidity that day and the run of days without rain before it. The slider sets how much they may differ.
Only pages with final weather data (ERA5 reanalysis) calculated in the same way as this fire’s; agricultural and grass burns and pages with data under review are left out.
Fires burning at the same time as this one (a week before or after) are left out: they share the same spell of weather and do not count as a precedent.
They are sorted by similarity, and the outlines of the first five are drawn.
How long did the Cuautitlán de García Barragán fire last?
According to the heat detections seen by satellite inside the perimeter, it burned from 9 May 2022 to 27 May 2022 (19 days). The perimeter dates it from 15 May 2022 to 20 May 2022.
How much area did it burn?
The perimeter GWIS (Copernicus) rebuilt from heat detections is 1,525 hectares (15.2 km²). It is an estimate: official national figures may differ.
Which municipalities burned?
The fire only entered Cuautitlán de García Barragán (1,532 ha, 1.1 %).
What was the weather like?
During the fire the temperature reached 31.8 °C, humidity dropped to 13 % and gusts hit 44 km/h. The fire danger index (FWI) reached 49, class Very high.
Where does this data come from?
From the GWIS (Copernicus) burnt perimeter, NASA FIRMS VIIRS hotspots and the administrative boundaries of Mexico (geoBoundaries). It is not an official report.
How did the fires that started in similar weather in this area end?
Fires less than 250 km away that started since 2016 with a similar FWI, humidity and dry spell: 23. Their median duration was 16 days and their median area 2,321 ha; 100 % went past 1,000 ha. In 12 of 23, not even 1 mm fell in the ten days after the end: they went out without rain. In the rest, the first rainy day brought a median of 5.9 mm.
Where to verify it
A satellite detection is not an official report. Final figures and the fire’s status are published by each country’s emergency service.
This page is built from satellite data and official records, and it sometimes gets things wrong: the wrong dates, the wrong town, two fires merged into one, or something that was not a wildfire at all. If you know this fire first-hand (you live nearby, saw it, fought it or reported on it), tell us what really happened and we will check it.
⚑Report an errorHow we know this›
Perimeter: GWIS (Copernicus), rebuilt from heat detections rather than mapped on imagery.
Dates adjusted with the VIIRS detections inside the perimeter, which said 15 May 2022 to 20 May 2022. 59 Suomi-NPP VIIRS detections on those dates.
Compared with CONAFOR: 1,085 official ha against 1,525 ha of perimeter; similar, but with reservations.
Weather: Copernicus ERA5 reanalysis at the fire location, in cells of about 25 km.
Built-up area and population come from the JRC Global Human Settlement Layer (epoch 2020, 100 m cells), summed inside the perimeter: an estimate of what was there, not a damage count.
The perimeter comes from the Copernicus Global Wildfire Information System (GWIS), which rebuilds it from MODIS and VIIRS heat detections and publishes it under CC BY 4.0. It is not measured on imagery as in Europe, so it is an estimate. Heat detections come from the VIIRS sensors aboard Suomi-NPP and NOAA-20, distributed by NASA FIRMS at 375 m resolution. Municipal boundaries come from geoBoundaries ADM2 (Creative Commons Attribution 4.0 (CC BY 4.0)). The area per municipality is computed by WorldFires by crossing the perimeter with those boundaries, so it may differ from each country’s official figure.