Skip to content
worldfires
MX · Mexico · →

Ajuchitlán del Progreso fire, 17 April 2023 Ajuchitlán del Progreso

Out · last detection 1 May 2023, 09:18 UTC

The fire started on 17 April 2023 in Ajuchitlán del Progreso, Mexico, and satellites saw it burning for 15 days. Copernicus’s global GWIS system rebuilt a burnt perimeter of 6,413 hectares from heat detections, spread across a single municipality. According to CONAFOR, it was detected on 17 April 2023 and declared extinguished on 24 April 2023.

It is the 69th largest in Guerrero since 2016 (of 612 with a page). Number 27 in Mexico in 2023, of 285.

Compare with…
Burnt area
6,413ha
GWIS perimeter (Copernicus)
Duration
15days
17 Apr 2023 – 1 May 2023
Municipalities hit
1
municipalities
Started on
17 Apr
2023
Heat detections
340
in a single hotspot: 40 MW
Danger at start
38
High · FWI index
Average daily power
119MW
detected power per day, on average

Where it burned

HOTSPOTS BY DAY 17 Apr1 May
1 May 2023

How it evolved, day by day

17 Apr 2023 · 6 MW · 1 18 Apr 2023 · 183 MW · 42 19 Apr 2023 · 174 MW · 29 20 Apr 2023 · 123 MW · 37 21 Apr 2023 · 403 MW · 71 22 Apr 2023 · 74 MW · 24 23 Apr 2023 · 220 MW · 57 24 Apr 2023 · 114 MW · 17 25 Apr 2023 · 10 MW · 4 26 Apr 2023 · 162 MW · 10 27 Apr 2023 · 42 MW · 7 28 Apr 2023 · 171 MW · 18 29 Apr 2023 · 7 MW · 5 30 Apr 2023 · 90 MW · 15 1 May 2023 · 7 MW · 3
17 Apr 20 Apr 21 Apr 23 Apr 26 Apr 29 Apr

Fire radiative power detected each day, in megawatts, and number of hotspots. The magenta bar marks the peak day.

The weather it burned in

35°high
37km/h · peak gust
10%lowest humidity

It had gone 31 days without rain (1 mm or more) when it started.

This area had burned before

89% of the perimeter overlaps earlier fires recorded since 2016: 2,776 ha in 2017, 961 ha in 2018, 4,789 ha in 2019, 1,444 ha in 2020, 674 ha in 2021. Part of it burned more than once, so the yearly figures add up to more than the 5,682 ha that had burned before.

How big is it?

10 km
It burned the equivalent of 4.1% of the area of London (64 km² against 1,583 km²).

London boundary: geoBoundaries · Office for National Statistics (Open Government Licence v3.0).

This compares size, not location: both shapes are at the same scale, north up, centred on each other.

What happened to each town

  1. Ajuchitlán del Progreso where it started
    6,451 ha reached on 17 Apr
    3.2 %

Burnt area inside each municipality, from crossing the GWIS perimeter with administrative boundaries. The distance runs from the point marking the centre of each area to the nearest fire: staying a kilometre away does not mean it reached the houses.

People and buildings inside the perimeter

GHSL 2025
Built-up area0.94 ha
Residents≈ 80

Inside the perimeter there were about 0.94 hectares of built-up land and about 80 residents (GHSL 2025, satellite-based estimate).

This is an estimate on 100 m cells, made from satellite imagery and census data: it does not mean that homes burned or that anyone was harmed. The perimeter also contains land that never burned. The GHSL 2025 epoch is a projection made from 2020 and earlier data.

Source: Global Human Settlement Layer (GHS-BUILT-S and GHS-POP R2023A), European Commission Joint Research Centre (JRC), © European Union, CC BY 4.0. Sum inside the perimeter computed by WorldFires. human-settlement.emergency.copernicus.eu

Official record

According to CONAFOR, this fire started on 17 April 2023 and burned 5,579 ha (the satellite measured 6,413 ha).

CONAFOR (Comisión Nacional Forestal), estadística de incendios forestales en datos.gob.mx (CC BY 4.0). This is the agency’s consolidated statistic: it measures the area in its own way, which is why it can differ from the satellite.

The weather day by day

ECMWF ERA5 reanalysis at the fire location, the standard reference for past weather, and the Canadian Fire Weather Index (the same system Copernicus uses), computed by WorldFires from that data. Days after the fire run until the first rain.

Open-Meteo.com (CC BY 4.0) · Copernicus Climate Change Service (ERA5)

Day High Min. humidity Peak gust Rain Danger (FWI)
17 Apr 31.0 °C 23 % 27 km/h 0.0 mm High 38
18 Apr 31.8 °C 22 % 32 km/h 0.0 mm Very high 40
19 Apr 32.8 °C 16 % 36 km/h 0.0 mm Very high 40
20 Apr 33.5 °C 20 % 32 km/h 0.0 mm Very high 39
21 Apr 35.1 °C 14 % 35 km/h 0.0 mm Very high 43
22 Apr 33.6 °C 20 % 30 km/h 0.8 mm High 35
23 Apr 32.5 °C 20 % 30 km/h 0.0 mm High 35
24 Apr 32.0 °C 24 % 31 km/h 0.4 mm High 36
25 Apr 32.5 °C 18 % 36 km/h 0.0 mm Very high 39
26 Apr 33.2 °C 15 % 34 km/h 0.0 mm Very high 41
27 Apr 32.5 °C 15 % 35 km/h 0.0 mm Very high 41
28 Apr 32.9 °C 14 % 34 km/h 0.0 mm Very high 42
29 Apr 32.7 °C 10 % 37 km/h 0.0 mm Very high 46
30 Apr 31.5 °C 21 % 33 km/h 0.2 mm Very high 42
1 May 32.3 °C 20 % 32 km/h 0.0 mm Very high 41
2 May after 32.4 °C 20 % 36 km/h 0.0 mm Very high 42
3 May after 33.6 °C 17 % 32 km/h 0.0 mm Very high 42
4 May after 32.8 °C 25 % 30 km/h 0.0 mm High 38
5 May after 32.3 °C 22 % 28 km/h 0.0 mm High 38
6 May after 34.6 °C 15 % 31 km/h 0.0 mm Very high 42
7 May after 34.2 °C 16 % 31 km/h 0.0 mm Very high 41
8 May after 33.0 °C 13 % 35 km/h 0.0 mm Very high 44
9 May after 33.4 °C 19 % 32 km/h 0.0 mm Very high 42
10 May after 33.6 °C 19 % 35 km/h 0.0 mm Very high 44
11 May after 33.6 °C 20 % 34 km/h 0.0 mm Very high 43

Before and after, from space

Drag the line to compare the same ground before the fire and after it.

Before · 10 Apr 2023
After · 8 May 2023

If the day is cloudy, change the date: each satellite passes once a day. In false colour the burnt ground looks brown or red.

The smoke

CAMS · Copernicus

On 29 April 2023 the air beside the fire reached 43 µg/m³ of PM2.5. That day averaged 25: 1.7 times the WHO daily guideline (15).

PM2.5 peak43 µg/m³
Days over the guideline9 days
PM1061 µg/m³
Optical depth0.82
16171819202122232425262728293012
Good Fair Moderate Poor Very poor Extremely poor

Particles from the Copernicus CAMS model at the centre of the perimeter; these are not measurements in each town. The pale bar is the worst hour, the solid one the daily average.

Open-Meteo.com (CC BY 4.0) · Copernicus Atmosphere Monitoring Service (CAMS)

Detections table · 340Every satellite heat detection, one by one, with time, satellite, power and coordinates.
⬇ Download CSV Times in UTC. Each detection is a 375 m pixel: a large fire yields hundreds per pass.
Date and timeSatelliteFRP (MW)LatLon

Other fires nearby

All fires in Mexico ›

Frequently asked questions

How long did the Ajuchitlán del Progreso fire last?
According to the heat detections seen by satellite inside the perimeter, it burned from 17 April 2023 to 1 May 2023 (15 days). The perimeter dates it from 18 April 2023 to 29 April 2023. According to CONAFOR, it was detected on 17 April 2023 and declared extinguished on 24 April 2023.
How much area did it burn?
The perimeter GWIS (Copernicus) rebuilt from heat detections is 6,413 hectares (64.1 km²). It is an estimate: official national figures may differ.
Which municipalities burned?
The fire only entered Ajuchitlán del Progreso (6,451 ha, 3.2 %).
What was the weather like?
During the fire the temperature reached 35.1 °C, humidity dropped to 10 % and gusts hit 37 km/h. The fire danger index (FWI) reached 46, class Very high.
Where does this data come from?
From the GWIS (Copernicus) burnt perimeter, NASA FIRMS VIIRS hotspots and the administrative boundaries of Mexico (geoBoundaries). It is not an official report.

Where to verify it

A satellite detection is not an official report. Final figures and the fire’s status are published by each country’s emergency service.

Emergency number: 911 · Emergency number and official warnings ›

Satellite cross-check

History of this page Changes in area, dates, name, official record or merged pages, compared every night since 24 October 2026.

No changes since 24 October 2026.

RSS Changes to this page

Does something look wrong on this page?

This page is built from satellite data and official records, and it sometimes gets things wrong: the wrong dates, the wrong town, two fires merged into one, or something that was not a wildfire at all. If you know this fire first-hand (you live nearby, saw it, fought it or reported on it), tell us what really happened and we will check it.

Report an error
What do you think is wrong?

We will only use your email to reply about this report. Privacy. This is not an emergency service: if there is a fire now, call 911.

How we know this
  • Perimeter: GWIS (Copernicus), rebuilt from heat detections rather than mapped on imagery.
  • Dates adjusted with the VIIRS detections inside the perimeter, which said 18 April 2023 to 29 April 2023. 340 Suomi-NPP VIIRS detections on those dates.
  • Compared with CONAFOR: 5,579 official ha against 6,413 ha of perimeter; they agree within 25%.
  • Weather: Copernicus ERA5 reanalysis at the fire location, in cells of about 25 km.
  • Built-up area and population come from the JRC Global Human Settlement Layer (epoch 2025, 100 m cells), summed inside the perimeter: an estimate of what was there, not a damage count.

How we build fire pages: methodology ›

Where this data comes from

The perimeter comes from the Copernicus Global Wildfire Information System (GWIS), which rebuilds it from MODIS and VIIRS heat detections and publishes it under CC BY 4.0. It is not measured on imagery as in Europe, so it is an estimate. Heat detections come from the VIIRS sensors aboard Suomi-NPP and NOAA-20, distributed by NASA FIRMS at 375 m resolution. Municipal boundaries come from geoBoundaries ADM2 (Creative Commons Attribution 4.0 (CC BY 4.0)). The area per municipality is computed by WorldFires by crossing the perimeter with those boundaries, so it may differ from each country’s official figure.