# San Luís fire, May 2023

The fire started on 19 May 2023 in San Luís, Honduras, and satellites saw it burning for 5 days. Copernicus’s global GWIS system rebuilt a burnt perimeter of 1,009 hectares from heat detections, spread across 3 municipalities.

## Key facts

- Burned area: 1,009 ha · perimeter rebuilt from heat detections (Copernicus GWIS)
- Dates: 19 May 2023 – 23 May 2023 (5 days)
- Heat detections (VIIRS): 21
- San Luís, Honduras · 14.7702, -87.3797
- It burned the equivalent of 0.6% of the area of London (10 km² against 1,583 km²). London boundary: geoBoundaries · Office for National Statistics (Open Government Licence v3.0).
- Number 147 in Honduras in 2023, of 149.
- It is number 58 by size of the 59 fires with a page that started in Comayagua since 2016.

## What happened to each town

| Municipality | Hectares | % of the municipality |
|---|---:|---:|
| San Luís (where it started) | 678 | 5.5 |
| Minas de Oro | 290 | 0.7 |
| Esquías | 46 | 0.1 |

## What burned

Land cover · ESA WorldCover 2021: Tree cover 52 %, Grassland 48 % (© ESA WorldCover project 2021 / Contains modified Copernicus Sentinel data (2021) processed by ESA WorldCover consortium, CC BY 4.0)

Between 673 and 1,355 m, 1,024 m on average (at 100 random points inside the perimeter: the real extremes may reach a little further). (produced using Copernicus WorldDEM-90 © DLR e.V. 2010-2014 and © Airbus Defence and Space GmbH 2014-2018 provided under COPERNICUS by the European Union and ESA; all rights reserved. The organisations in charge of the Copernicus programme by law or by delegation do not incur any liability for any use of the Copernicus WorldDEM-90)


## The smoke

On 24 May 2023 the air beside the fire reached 55 µg/m³ of PM2.5. That day averaged 30: 2.0 times the WHO daily guideline (15).

- Days over the guideline: 6
- CAMS · Copernicus

## People and buildings inside the perimeter

Inside the perimeter there were about 0.33 hectares of built-up land and about 20 residents (GHSL 2025, satellite-based estimate).

> This is an estimate on 100 m cells, made from satellite imagery and census data: it does not mean that homes burned or that anyone was harmed. The perimeter also contains land that never burned. The GHSL 2025 epoch is a projection made from 2020 and earlier data.

- Source: Global Human Settlement Layer (GHS-BUILT-S and GHS-POP R2023A), European Commission Joint Research Centre (JRC), © European Union, CC BY 4.0. Sum inside the perimeter computed by WorldFires. https://human-settlement.emergency.copernicus.eu/

## This area had burned before

- 2017: 245 ha
- 2019: 642 ha
- 2020: 2 ha

## Its twins: fires that started in the same weather

It started with an FWI of 18.7, a minimum humidity of 32% and 2 days without rain. Fires in the area that started in weather like this since 2016: 18.

- median duration: 9 days
- median area: 1,322 ha
- went past 1,000 ha: 100 %
- rain at the end (median; 15 of 18 had it): 4.1 mm

It burned an area similar to its twins (1,009 ha against a median of 1,322 ha) and lasted 5 days, against 9 days. In 3 of 18, not even 1 mm fell in the ten days after the end: they went out without rain. In the rest, the first rainy day brought a median of 4.1 mm.

- [La Unión fire, April 2024](https://worldfires.org/en/fire/la-union-olancho-2024-04) — 1,171 ha, FWI 20.8
- [Distrito Central fire, April 2024](https://worldfires.org/en/fire/distrito-central-2024-04) — 1,066 ha, FWI 20.1
- [Distrito Central fire, April 2018](https://worldfires.org/en/fire/distrito-central-2018-04-2) — 1,157 ha, FWI 16.6
- [La Trinidad fire, March 2019](https://worldfires.org/en/fire/la-trinidad-2019-03) — 4,385 ha, FWI 21.6
- [Minas de Oro fire, February 2019](https://worldfires.org/en/fire/minas-de-oro-2019-02-2) — 1,019 ha, FWI 20.5

## Frequently asked questions

### How long did the San Luís fire last?

According to the heat detections seen by satellite inside the perimeter, it burned from 19 May 2023 to 23 May 2023 (5 days). The perimeter dates it from 19 May 2023 to 22 May 2023.

### How much area did it burn?

The perimeter GWIS (Copernicus) rebuilt from heat detections is 1,009 hectares (10.1 km²). It is an estimate: official national figures may differ.

### Which municipalities burned?

The fire entered 3 municipalities: San Luís (678 ha, 5.5 %); Minas de Oro (290 ha, 0.7 %); Esquías (46 ha, 0.1 %).

### What was the weather like?

During the fire the temperature reached 33.7 °C, humidity dropped to 30 % and gusts hit 44 km/h. The fire danger index (FWI) reached 26, class High.

### Where does this data come from?

From the GWIS (Copernicus) burnt perimeter, NASA FIRMS VIIRS hotspots and the administrative boundaries of Honduras (geoBoundaries). It is not an official report.

### How did the fires that started in similar weather in this area end?

Fires less than 250 km away that started since 2016 with a similar FWI, humidity and dry spell: 18. Their median duration was 9 days and their median area 1,322 ha; 100 % went past 1,000 ha. In 3 of 18, not even 1 mm fell in the ten days after the end: they went out without rain. In the rest, the first rainy day brought a median of 4.1 mm.

## Other fires nearby

- [Cedros, 15 March 2020](https://worldfires.org/en/fire/cedros-2020-03.md) · 6,968 ha · 24 km
- [Cedros, 19 March 2020](https://worldfires.org/en/fire/cedros-2020-03-2.md) · 7,594 ha · 26 km
- [San Ignacio, March 2018](https://worldfires.org/en/fire/san-ignacio-2018-03.md) · 6,368 ha · 31 km
- [Cedros, 25 March 2020](https://worldfires.org/en/fire/cedros-2020-03-3.md) · 15,272 ha · 36 km

## How we know this

- Perimeter: GWIS (Copernicus), rebuilt from heat detections rather than mapped on imagery.
- Dates adjusted with the VIIRS detections inside the perimeter, which said 19 May 2023 to 22 May 2023. 21 Suomi-NPP VIIRS detections on those dates.
- We have not matched this page with any official record.
- Weather: Copernicus ERA5 reanalysis at the fire location, in cells of about 25 km.
- Built-up area and population come from the JRC Global Human Settlement Layer (epoch 2025, 100 m cells), summed inside the perimeter: an estimate of what was there, not a damage count.

[How we build fire pages: methodology](https://worldfires.org/en/methodology)

## History of this page

- 2026-10-25: Last day with fire: 22 May 2023 → 23 May 2023.

## What each figure measures

Area: that of the published perimeter (or the estimate from heat detections if there is none yet), not the country’s official figure. Rank in the country: among the fire pages of that year. Rank in the region: among the fire pages that started there since 2016. By municipality: the part of the perimeter inside each one.

## How to cite

WorldFires, “San Luís fire, May 2023”, https://worldfires.org/en/fire/san-luis-comayagua-2023-05 (accessed 22 November 2026). Sources: GWIS / Copernicus (reconstructed from VIIRS) (CC BY 4.0), NASA FIRMS (VIIRS).

Citable version (25 October 2026): https://worldfires.org/en/fire/san-luis-comayagua-2023-05?v=2026-10-25

> Open satellite data processed automatically: it may contain errors and is not an official emergency service. If there is a fire, call your local emergency number. Emergency number (Honduras): 911.

Full version with maps: https://worldfires.org/en/fire/san-luis-comayagua-2023-05
