# Rivière-Mouchalagane fire, 27 June 2026

The fire started on 27 June 2026 in Rivière-Mouchalagane, Canada, and satellites saw it burning for 4 days. Copernicus’s global GWIS system rebuilt a burnt perimeter of 7,221 hectares from heat detections, spread across a single municipality.

## Key facts

- Burned area: 7,221 ha · perimeter rebuilt from heat detections (Copernicus GWIS)
- Dates: 27 June 2026 – 30 June 2026 (4 days)
- Heat detections (VIIRS): 216
- Rivière-Mouchalagane, Canada · 52.275, -69.6867
- It burned the equivalent of 4.6% of the area of London (72 km² against 1,583 km²). London boundary: geoBoundaries · Office for National Statistics (Open Government Licence v3.0).
- Number 145 in Canada in 2026, of 549.

## What happened to each town

| Municipality | Hectares | % of the municipality |
|---|---:|---:|
| Rivière-Mouchalagane (where it started) | 7,204 | 0.2 |

## What burned

Land cover · ESA WorldCover 2021: Tree cover 91 %, Grassland 4.1 %, Water 2.6 %, Shrubland 1.1 %, Moss and lichen 1.1 % (© ESA WorldCover project 2021 / Contains modified Copernicus Sentinel data (2021) processed by ESA WorldCover consortium, CC BY 4.0)

Between 442 and 726 m, 568 m on average (at 200 random points inside the perimeter: the real extremes may reach a little further). (produced using Copernicus WorldDEM-90 © DLR e.V. 2010-2014 and © Airbus Defence and Space GmbH 2014-2018 provided under COPERNICUS by the European Union and ESA; all rights reserved. The organisations in charge of the Copernicus programme by law or by delegation do not incur any liability for any use of the Copernicus WorldDEM-90)


## The smoke

On 30 June 2026 the air beside the fire reached 252 µg/m³ of PM2.5. That day averaged 141: 9.4 times the WHO daily guideline (15).

- Days over the guideline: 5
- CAMS · Copernicus

## People and buildings inside the perimeter

Inside the perimeter there was no noticeable built-up land and almost nobody lived there (GHSL 2025, satellite-based estimate).

> This is an estimate on 100 m cells, made from satellite imagery and census data: it does not mean that homes burned or that anyone was harmed. The perimeter also contains land that never burned. The GHSL 2025 epoch is a projection made from 2020 and earlier data.

- Source: Global Human Settlement Layer (GHS-BUILT-S and GHS-POP R2023A), European Commission Joint Research Centre (JRC), © European Union, CC BY 4.0. Sum inside the perimeter computed by WorldFires. https://human-settlement.emergency.copernicus.eu/

## Frequently asked questions

### How long did the Rivière-Mouchalagane fire last?

GWIS (Copernicus) dates it between 27 June 2026 and 30 June 2026: 4 days between the first and last heat detection of the perimeter.

### How much area did it burn?

The perimeter GWIS (Copernicus) rebuilt from heat detections is 7,221 hectares (72.2 km²). It is an estimate: official national figures may differ.

### Which municipalities burned?

The fire only entered Rivière-Mouchalagane (7,204 ha, 0.2 %).

### What was the weather like?

During the fire the temperature reached 27.3 °C, humidity dropped to 23 % and gusts hit 47 km/h. The fire danger index (FWI) reached 21, class Moderate.

### Where does this data come from?

From the GWIS (Copernicus) burnt perimeter, NASA FIRMS VIIRS hotspots and the administrative boundaries of Canada (geoBoundaries). It is not an official report.

## Other fires nearby

- [Rivière-Mouchalagane, 29 June 2026](https://worldfires.org/en/fire/riviere-mouchalagane-2026-06-5.md) · 1,491 ha · 14 km
- [Rivière-Mouchalagane, 29 June 2026](https://worldfires.org/en/fire/riviere-mouchalagane-2026-06-6.md) · 1,271 ha · 14 km
- [Mont-Valin, July 2020](https://worldfires.org/en/fire/mont-valin-2020-07.md) · 1,174 ha · 33 km

## How we know this

- Perimeter: GWIS (Copernicus), rebuilt from heat detections rather than mapped on imagery.
- Dates from the perimeter: the VIIRS detections inside it did not change them. 216 Suomi-NPP VIIRS detections on those dates.
- We have not matched this page with any official record.
- Weather: Copernicus ERA5 reanalysis at the fire location, in cells of about 25 km.
- Built-up area and population come from the JRC Global Human Settlement Layer (epoch 2025, 100 m cells), summed inside the perimeter: an estimate of what was there, not a damage count.

[How we build fire pages: methodology](https://worldfires.org/en/methodology)

## What each figure measures

Area: that of the published perimeter (or the estimate from heat detections if there is none yet), not the country’s official figure. Rank in the country: among the fire pages of that year. Rank in the region: among the fire pages that started there since 2016. By municipality: the part of the perimeter inside each one.

## How to cite

WorldFires, “Rivière-Mouchalagane fire, 27 June 2026”, https://worldfires.org/en/fire/riviere-mouchalagane-2026-06 (accessed 23 November 2026). Sources: GWIS / Copernicus (reconstructed from VIIRS) (CC BY 4.0), NASA FIRMS (VIIRS).

Citable version (24 October 2026): https://worldfires.org/en/fire/riviere-mouchalagane-2026-06?v=2026-10-24

> Open satellite data processed automatically: it may contain errors and is not an official emergency service. If there is a fire, call your local emergency number. Emergency number (Canada): 911.

Full version with maps: https://worldfires.org/en/fire/riviere-mouchalagane-2026-06
