The fire started on 16 January 2026 in Las Mercedes, Venezuela, and satellites saw it burning for 1 day. Copernicus’s global GWIS system rebuilt a burnt perimeter of 1,558 hectares from heat detections, spread across a single municipality.

## Key facts

- Burned area: 1,558 ha · perimeter rebuilt from heat detections (Copernicus GWIS)
- Dates: 16 January 2026 – 16 January 2026 (1 day)
- Heat detections (VIIRS): 20
- Las Mercedes, Venezuela · 8.6066, -66.599
- It burned the equivalent of 1% of the area of London (16 km² against 1,583 km²). London boundary: geoBoundaries · Office for National Statistics (Open Government Licence v3.0).
- Number 388 in Venezuela in 2026, of 413.

## What happened to each town

| Municipality | Hectares | % of the municipality |
|---|---:|---:|
| Las Mercedes (where it started) | 1,569 | 0.2 |

## What burned

Land cover · ESA WorldCover 2021: Grassland 92 %, Shrubland 5.1 %, Tree cover 3.3 % (© ESA WorldCover project 2021 / Contains modified Copernicus Sentinel data (2021) processed by ESA WorldCover consortium, CC BY 4.0)

Between 123 and 187 m, 164 m on average (at 100 random points inside the perimeter: the real extremes may reach a little further). (produced using Copernicus WorldDEM-90 © DLR e.V. 2010-2014 and © Airbus Defence and Space GmbH 2014-2018 provided under COPERNICUS by the European Union and ESA; all rights reserved. The organisations in charge of the Copernicus programme by law or by delegation do not incur any liability for any use of the Copernicus WorldDEM-90)


## The smoke

On 16 January 2026 the air beside the fire reached 12 µg/m³ of PM2.5, but no daily average passed the WHO guideline (15).

- Days over the guideline: 0
- CAMS · Copernicus

## People and buildings inside the perimeter

Inside the perimeter there was no noticeable built-up land and almost nobody lived there (GHSL 2025, satellite-based estimate).

> This is an estimate on 100 m cells, made from satellite imagery and census data: it does not mean that homes burned or that anyone was harmed. The perimeter also contains land that never burned. The GHSL 2025 epoch is a projection made from 2020 and earlier data.

- Source: Global Human Settlement Layer (GHS-BUILT-S and GHS-POP R2023A), European Commission Joint Research Centre (JRC), © European Union, CC BY 4.0. Sum inside the perimeter computed by WorldFires. https://human-settlement.emergency.copernicus.eu/

## This area had burned before

- 2019: 23 ha
- 2024: 97 ha

## Frequently asked questions

### How long did the Las Mercedes fire last?

GWIS (Copernicus) dates it between 16 January 2026 and 16 January 2026: 1 day between the first and last heat detection of the perimeter.

### How much area did it burn?

The perimeter GWIS (Copernicus) rebuilt from heat detections is 1,558 hectares (15.6 km²). It is an estimate: official national figures may differ.

### Which municipalities burned?

The fire only entered Las Mercedes (1,569 ha, 0.2 %).

### What was the weather like?

During the fire the temperature reached 36.6 °C, humidity dropped to 34 % and gusts hit 46 km/h. The fire danger index (FWI) reached 48, class Very high.

### Where does this data come from?

From the GWIS (Copernicus) burnt perimeter, NASA FIRMS VIIRS hotspots and the administrative boundaries of Venezuela (geoBoundaries). It is not an official report.

## Other fires nearby

- [Las Mercedes, 8 February 2026](https://worldfires.org/en/fire/las-mercedes-2026-02-3.md) · 5,823 ha · 6 km
- [Las Mercedes, 10 March 2024](https://worldfires.org/en/fire/las-mercedes-2024-03-3.md) · 7,611 ha · 10 km
- [Las Mercedes, 6 March 2024](https://worldfires.org/en/fire/las-mercedes-2024-03.md) · 2,898 ha · 22 km
- [Las Mercedes, 20 March 2024](https://worldfires.org/en/fire/las-mercedes-2024-03-4.md) · 3,425 ha · 27 km
- [Las Mercedes, March 2020](https://worldfires.org/en/fire/las-mercedes-2020-03.md) · 3,752 ha · 32 km
- [Las Mercedes, February 2023](https://worldfires.org/en/fire/las-mercedes-2023-02.md) · 3,576 ha · 32 km

## How we know this

- Perimeter: GWIS (Copernicus), rebuilt from heat detections rather than mapped on imagery.
- Dates from the perimeter: the VIIRS detections inside it did not change them. 20 Suomi-NPP VIIRS detections on those dates.
- We have not matched this page with any official record.
- Weather: Copernicus ERA5 reanalysis at the fire location, in cells of about 25 km.
- Built-up area and population come from the JRC Global Human Settlement Layer (epoch 2025, 100 m cells), summed inside the perimeter: an estimate of what was there, not a damage count.

[How we build fire pages: methodology](https://worldfires.org/en/methodology)

## What each figure measures

Area: that of the published perimeter (or the estimate from heat detections if there is none yet), not the country’s official figure. Rank in the country: among the fire pages of that year. Rank in the region: among the fire pages that started there since 2016. By municipality: the part of the perimeter inside each one.

## How to cite

WorldFires, “Las Mercedes fire, January 2026”, https://worldfires.org/en/fire/las-mercedes-2026-01 (accessed 24 November 2026). Sources: GWIS / Copernicus (reconstructed from VIIRS) (CC BY 4.0), NASA FIRMS (VIIRS).

Citable version (24 October 2026): https://worldfires.org/en/fire/las-mercedes-2026-01?v=2026-10-24

> Open satellite data processed automatically: it may contain errors and is not an official emergency service. If there is a fire, call your local emergency number. Emergency number (Venezuela): 911.

Full version with maps: https://worldfires.org/en/fire/las-mercedes-2026-01