The fire started on 1 September 2025 in Fraser Valley B, Canada, and satellites saw it burning for 38 days. Canada’s CWFIS (Natural Resources Canada) mapped an official burnt perimeter of 1,438 hectares from satellite imagery, spread across a single census subdivision.

## Key facts

- Burned area: 1,438 ha · official perimeter (CWFIS NBAC); current season rebuilt from heat detections (Copernicus GWIS)
- Dates: 1 September 2025 – 8 October 2025 (38 days)
- Heat detections (VIIRS): 0
- Fraser Valley B, Canada · 49.2295, -120.9774
- It burned the equivalent of 0.9% of the area of London (14 km² against 1,583 km²). London boundary: geoBoundaries · Office for National Statistics (Open Government Licence v3.0).
- Number 272 in Canada in 2025, of 301.

## What happened to each census subdivision

| Subdivision | Hectares | % of the census subdivision |
|---|---:|---:|
| Fraser Valley B (where it started) | 1,433 | 0.5 |

## What burned

Land cover · ESA WorldCover 2021: Tree cover 93 %, Grassland 6.4 % (© ESA WorldCover project 2021 / Contains modified Copernicus Sentinel data (2021) processed by ESA WorldCover consortium, CC BY 4.0)

Between 880 and 1,964 m, 1,435 m on average (at 100 random points inside the perimeter: the real extremes may reach a little further). (produced using Copernicus WorldDEM-90 © DLR e.V. 2010-2014 and © Airbus Defence and Space GmbH 2014-2018 provided under COPERNICUS by the European Union and ESA; all rights reserved. The organisations in charge of the Copernicus programme by law or by delegation do not incur any liability for any use of the Copernicus WorldDEM-90)


## The smoke

On 6 September 2025 the air beside the fire reached 332 µg/m³ of PM2.5. That day averaged 239: 16 times the WHO daily guideline (15).

- Days over the guideline: 8
- CAMS · Copernicus

## People and buildings inside the perimeter

Inside the perimeter there was no noticeable built-up land and almost nobody lived there (GHSL 2025, satellite-based estimate).

> This is an estimate on 100 m cells, made from satellite imagery and census data: it does not mean that homes burned or that anyone was harmed. The perimeter also contains land that never burned. The GHSL 2025 epoch is a projection made from 2020 and earlier data.

- Source: Global Human Settlement Layer (GHS-BUILT-S and GHS-POP R2023A), European Commission Joint Research Centre (JRC), © European Union, CC BY 4.0. Sum inside the perimeter computed by WorldFires. https://human-settlement.emergency.copernicus.eu/

## Frequently asked questions

### How long did the Fraser Valley B fire last?

It burned between 1 September 2025 and 8 October 2025: 38 days, according to the dates recorded by Canada’s CWFIS and the heat detections seen by satellite.

### How much area did it burn?

The official perimeter mapped by Canada’s CWFIS (Natural Resources Canada) is 1,438 hectares (14.4 km²). Other tallies, such as those of provincial agencies, may give slightly different figures.

### Which census subdivisions burned?

The fire only entered Fraser Valley B (1,433 ha, 0.5 %).

### What was the weather like?

During the fire the temperature reached 27.7 °C, humidity dropped to 28 % and gusts hit 56 km/h. The fire danger index (FWI) reached 23, class High.

### Where does this data come from?

From the official burnt perimeter of Canada’s CWFIS (NBAC, Natural Resources Canada) or, for the current season and until NBAC publishes it, the one rebuilt by GWIS (Copernicus); from NASA FIRMS VIIRS hotspots; and from the administrative boundaries of Canada. It is not an official report.

## Other fires nearby

- [modified response, August 2018](https://worldfires.org/en/fire/fraser-valley-b-2018-08.md) · 5,949 ha · 17 km
- [Border 2, July 2026](https://worldfires.org/en/fire/border-2-fire-2026-07.md) · 9,654 ha · 20 km
- [Fraser Valley B, 21 July 2026](https://worldfires.org/en/fire/fraser-valley-b-2026-07-2.md) · 12,045 ha · 22 km
- [Garrison Lake, July 2021](https://worldfires.org/en/fire/okanagan-similkameen-h-2021-07.md) · 14,140 ha · 23 km
- [Heather Lake, September 2022](https://worldfires.org/en/fire/okanagan-similkameen-h-2022-09.md) · 7,348 ha · 31 km
- [Parks, August 2022](https://worldfires.org/en/fire/parks-fire-2022-08.md) · 14,007 ha · 33 km

## How we know this

- Perimeter: NBAC (Natural Resources Canada), official.
- Dates from the perimeter: the VIIRS detections inside it did not change them. No Suomi-NPP VIIRS detections on those dates.
- We have not matched this page with any official record.
- Weather: Copernicus ERA5 reanalysis at the fire location, in cells of about 25 km.
- Built-up area and population come from the JRC Global Human Settlement Layer (epoch 2025, 100 m cells), summed inside the perimeter: an estimate of what was there, not a damage count.

[How we build fire pages: methodology](https://worldfires.org/en/methodology)

## History of this page

- 2026-11-18: Area: 3,635 → 1,438 ha.
- 2026-11-18: Last day with fire: 14 September 2025 → 8 October 2025.
- 2026-10-25: Last day with fire: 9 September 2025 → 14 September 2025.

## What each figure measures

Area: that of the published perimeter (or the estimate from heat detections if there is none yet), not the country’s official figure. Rank in the country: among the fire pages of that year. Rank in the region: among the fire pages that started there since 2016. By municipality: the part of the perimeter inside each one.

## How to cite

WorldFires, “Fraser Valley B fire, September 2025”, https://worldfires.org/en/fire/fraser-valley-b-2025-09-3 (accessed 22 November 2026). Sources: NBAC / CWFIS (Natural Resources Canada) (Open Government Licence – Canada), NASA FIRMS (VIIRS).

Citable version (18 November 2026): https://worldfires.org/en/fire/fraser-valley-b-2025-09-3?v=2026-11-18

> Open satellite data processed automatically: it may contain errors and is not an official emergency service. If there is a fire, call your local emergency number. Emergency number (Canada): 911.

Full version with maps: https://worldfires.org/en/fire/fraser-valley-b-2025-09-3