# Cedeño fire, 7 March 2024

The fire started on 7 March 2024 in Cedeño, Venezuela, and satellites saw it burning for 18 days. Copernicus’s global GWIS system rebuilt a burnt perimeter of 1,632 hectares from heat detections, spread across a single municipality.

## Key facts

- Burned area: 1,632 ha · perimeter rebuilt from heat detections (Copernicus GWIS)
- Dates: 7 March 2024 – 24 March 2024 (18 days)
- Heat detections (VIIRS): 92
- Cedeño, Venezuela · 7.5676, -65.9429
- It burned the equivalent of 1% of the area of London (16 km² against 1,583 km²). London boundary: geoBoundaries · Office for National Statistics (Open Government Licence v3.0).
- Number 396 in Venezuela in 2024, of 482.
- It is number 126 by size of the 163 fires with a page that started in Bolívar since 2016.

## What happened to each town

| Municipality | Hectares | % of the municipality |
|---|---:|---:|
| Cedeño (where it started) | 1,645 | 0.0 |

## What burned

Land cover · ESA WorldCover 2021: Tree cover 65 %, Grassland 33 %, Water 1.2 %, Herbaceous wetland 0.8 % (© ESA WorldCover project 2021 / Contains modified Copernicus Sentinel data (2021) processed by ESA WorldCover consortium, CC BY 4.0)

Between 30 and 47 m, 35 m on average (at 100 random points inside the perimeter: the real extremes may reach a little further). (produced using Copernicus WorldDEM-90 © DLR e.V. 2010-2014 and © Airbus Defence and Space GmbH 2014-2018 provided under COPERNICUS by the European Union and ESA; all rights reserved. The organisations in charge of the Copernicus programme by law or by delegation do not incur any liability for any use of the Copernicus WorldDEM-90)


## The smoke

On 25 March 2024 the air beside the fire reached 40 µg/m³ of PM2.5. That day averaged 31: 2.0 times the WHO daily guideline (15).

- Days over the guideline: 6
- CAMS · Copernicus

## People and buildings inside the perimeter

Inside the perimeter there was no noticeable built-up land and almost nobody lived there (GHSL 2025, satellite-based estimate).

> This is an estimate on 100 m cells, made from satellite imagery and census data: it does not mean that homes burned or that anyone was harmed. The perimeter also contains land that never burned. The GHSL 2025 epoch is a projection made from 2020 and earlier data.

- Source: Global Human Settlement Layer (GHS-BUILT-S and GHS-POP R2023A), European Commission Joint Research Centre (JRC), © European Union, CC BY 4.0. Sum inside the perimeter computed by WorldFires. https://human-settlement.emergency.copernicus.eu/

## Its twins: fires that started in the same weather

It started with an FWI of 45.7, a minimum humidity of 33% and 27 days without rain. Fires in the area that started in weather like this since 2016: 27.

- median duration: 8 days
- median area: 1,951 ha
- went past 1,000 ha: 100 %
- rain at the end (median; 12 of 27 had it): 2.4 mm

It burned an area similar to its twins (1,632 ha against a median of 1,951 ha) and lasted 18 days, against 8 days. In 15 of 27, not even 1 mm fell in the ten days after the end: they went out without rain. In the rest, the first rainy day brought a median of 2.4 mm.

- [Pedro Camejo fire, February 2017](https://worldfires.org/en/fire/pedro-camejo-2017-02-8) — 1,562 ha, FWI 44.7
- [San Fernando fire, January 2024](https://worldfires.org/en/fire/san-fernando-2024-01) — 1,951 ha, FWI 44.7
- [San Gerónimo de Guayabal fire, January 2016](https://worldfires.org/en/fire/san-geronimo-de-guayabal-2016-01) — 1,558 ha, FWI 47.7
- [Pedro Camejo fire, February 2023](https://worldfires.org/en/fire/pedro-camejo-2023-02-7) — 1,594 ha, FWI 42.4
- [Pedro Camejo fire, February 2017](https://worldfires.org/en/fire/pedro-camejo-2017-02-6) — 6,430 ha, FWI 47.7

## Frequently asked questions

### How long did the Cedeño fire last?

According to the heat detections seen by satellite inside the perimeter, it burned from 7 March 2024 to 24 March 2024 (18 days). The perimeter dates it from 13 March 2024 to 23 March 2024.

### How much area did it burn?

The perimeter GWIS (Copernicus) rebuilt from heat detections is 1,632 hectares (16.3 km²). It is an estimate: official national figures may differ.

### Which municipalities burned?

The fire only entered Cedeño (1,645 ha, 0.0 %).

### What was the weather like?

During the fire the temperature reached 40.1 °C, humidity dropped to 20 % and gusts hit 45 km/h. The fire danger index (FWI) reached 51, class Extreme.

### Where does this data come from?

From the GWIS (Copernicus) burnt perimeter, NASA FIRMS VIIRS hotspots and the administrative boundaries of Venezuela (geoBoundaries). It is not an official report.

### How did the fires that started in similar weather in this area end?

Fires less than 250 km away that started since 2016 with a similar FWI, humidity and dry spell: 27. Their median duration was 8 days and their median area 1,951 ha; 100 % went past 1,000 ha. In 15 of 27, not even 1 mm fell in the ten days after the end: they went out without rain. In the rest, the first rainy day brought a median of 2.4 mm.

## Other fires nearby

- [Cedeño, 20 February 2024](https://worldfires.org/en/fire/cedeno-bolivar-2024-02.md) · 2,982 ha · 8 km
- [Leonardo Infante, 10 March 2018](https://worldfires.org/en/fire/leonardo-infante-2018-03.md) · 6,188 ha · 24 km
- [Leonardo Infante, 13 March 2018](https://worldfires.org/en/fire/leonardo-infante-2018-03-4.md) · 3,390 ha · 24 km
- [Leonardo Infante, March 2020](https://worldfires.org/en/fire/leonardo-infante-2020-03.md) · 3,681 ha · 34 km
- [Cedeño, 14 March 2018](https://worldfires.org/en/fire/cedeno-bolivar-2018-03.md) · 2,834 ha · 39 km

## How we know this

- Perimeter: GWIS (Copernicus), rebuilt from heat detections rather than mapped on imagery.
- Dates adjusted with the VIIRS detections inside the perimeter, which said 13 March 2024 to 23 March 2024. 92 Suomi-NPP VIIRS detections on those dates.
- We have not matched this page with any official record.
- Weather: Copernicus ERA5 reanalysis at the fire location, in cells of about 25 km.
- Built-up area and population come from the JRC Global Human Settlement Layer (epoch 2025, 100 m cells), summed inside the perimeter: an estimate of what was there, not a damage count.

[How we build fire pages: methodology](https://worldfires.org/en/methodology)

## History of this page

- 2026-10-25: Last day with fire: 23 March 2024 → 24 March 2024.
- 2026-10-25: Start date: 13 March 2024 → 7 March 2024.

## What each figure measures

Area: that of the published perimeter (or the estimate from heat detections if there is none yet), not the country’s official figure. Rank in the country: among the fire pages of that year. Rank in the region: among the fire pages that started there since 2016. By municipality: the part of the perimeter inside each one.

## How to cite

WorldFires, “Cedeño fire, 7 March 2024”, https://worldfires.org/en/fire/cedeno-bolivar-2024-03-10 (accessed 28 November 2026). Sources: GWIS / Copernicus (reconstructed from VIIRS) (CC BY 4.0), NASA FIRMS (VIIRS).

Citable version (25 October 2026): https://worldfires.org/en/fire/cedeno-bolivar-2024-03-10?v=2026-10-25

> Open satellite data processed automatically: it may contain errors and is not an official emergency service. If there is a fire, call your local emergency number. Emergency number (Venezuela): 911.

Full version with maps: https://worldfires.org/en/fire/cedeno-bolivar-2024-03-10
